"Park" refers to the industrial park. While a small street scene with shops and residences will be modeled, the real reason for the railroad is the industrial complex. As I've pored over period photos, the ones grabbing my interest are scenes of industry and residential areas, more than the countryside and open wilderness. I hope to expand this railroad into those areas eventually, but for now the city, or rather, this aspect of the city will dominate the scene. Here's one such photo that lived on my desktop for a while:
Ocala Manufacturing Company - Ocala, Florida. 192-. Black &
white photograph, 4 x 5 in. State Archives of Florida, Florida Memory.
<https://www.floridamemory.com/items/show/6252>, accessed 5 August
2018. Right-click and open in a new tab for a much larger view.
I've also had good input from folks over on the Railroad-Line forum into the track plan. Here is the latest incarnation. Note the yellow highlighted line, signifying the main track. At some point I'd like to continue this track to another area in order to run through trains. For now, however, the area modeled is self contained and can be run simply as a loop of track or switched in a more formalized operating scheme.
Looking back at this series years later, I have come to realize what is perhaps unique about the approach taken to building this railroad. I imagine Jim Kelly had an idea in mind as to what direction the build would take and how the railroad would progress, but that wasn't clear up front. Seems like MR project layouts are presented, most often, after they've been completed. The step-by-step articles that follow are retrospectives on what was done and how.
In the case of the Cripple Creek Central there seems to be an organic, 'let's see where this leads' approach. Track was 'laid', but not fastened down so that changes could be made later. Buildings were purchased because the author liked the way they looked, almost like the average person would do when perusing their local hobby shop. Scenes were built then later modified. The control method was changed half-way through the series. While the general direction remained coherent, the details were more fluid and it almost seemed as if you got a glimpse inside the mind of the creators (there were multiple contributing authors!) as they each worked on the project.
This seems very different than the more dominant approach put forward by the conventional school of planning, often attributed to John Armstrong. In this method the track plan is made to fit the space and is driven most often by the goal of getting in as much operation as possible. That approach, combined with the emphasis on prototype modeling, has been a strong current in the hobby for a long time, certainly since the days of the great freelancers like John Allen and W. Allen McClelland or the artists like Malcolm Furlow and Dave Methlie.
My approach to building this railroad is, as I see it, somewhere in between. I want some operations so I've planned those in. I think it is best to do that up front when you have specific structures you want to include such as the Purina Mill and Union Ice industries shown on the plan. But I've also left room for other elements to change. Currently I'm considering a coal dealer for the unnamed Industry A. That would fit well next to the Ice plant, but we'll see what I feel like doing when I get to that stage in the construction.
The primary reason I mention the Cripple Creek Central, however, is the measured monthly approach they took to build this model railroad over the course of two years. The series was so comprehensive, including everything from soup to nuts, that Kalmbach made it into a book. I would like to build and complete - yes, complete - this model railroad in a couple years. I don't buy the tired trope, "a model railroad is never finished". While the progressive steps I take in building the Pine Branch Park won't exactly parallel the stages of construction seen in the CCC series, I will aim for monthly installments that show visible progress on the construction of the railroad with a varying focus for each.
Naturally benchwork and trackwork comes first, but soon after I will be installing a station and some streets. I may devote a month to the Purina Mill, but also to the Woodland Scenics grain truck and the Purina ventilated box cars (former reefers) I have to upgrade and rebuild. Static grass wasn't really a thing in 1991, but I have all the parts to build a static grass applicator so that'll feature one month along with putting down some ground cover.
But beyond a few vague ideas, I'm going to let the build take me where it will. Adam Savage talks about the way a project actually leads you as you build it and suddenly new directions appear which you wouldn't have seen before you began. I know this to be true and it is an exciting aspect of any long-term project. I hope you'll journey along with me as I build the Pine Branch Park Model Railroad.
Looking forward to seeing your model railroad develop! For some unknown reason Ocala rings a bell, but I can't say why just yet - I need to ponder for awhile :-)
ReplyDeleteThanks, Jim. Ocala was my home town from 1980-1993. Despite the humidity and the insects it was still a good place to grow up.
ReplyDeleteGalen
ReplyDeleteJust saw the blog. Looks good. Do not know if you are familiar with Tap Lines but it is a great site. It has many articles of older short lines in Florida including the Ocklawaha Valley Railroad that ran from Ocala to Palatka.
Bill Michael
Hello, Bill. I am indeed familiar with the Tap Lines site and have drawn on it for inspiration. As this plan develops in my imagination I am locating it on the map in or around Ocala, somewhere on the East side between Ocala proper and Silver Springs. This is all fiction of course, since I'm freelancing.
ReplyDeleteThanks for the comment.
Galen