Search This Blog

Sunday, February 18, 2024

Drug Store Saga, Part III

Here's the belated but as-promised continuation of the Scale Structures Limited Drug Store project.  Let's start around back:

 
The windows and doors in this image are merely set in place for now to avoid dings while heavier construction continues.  The vertical gaps will be covered by drain pipes with scuppers near the top and the horizontal line will be hidden by a wide sign attached to the wall.  In this way the wall can remain removable to access wiring and details inside the building's second and third floors.  I had thought I might use magnets to hold the wall in place but a simpler solution will be sticky wax or even double sided tape.  Below, the view with wall removed:

Access granted.  You may proceed with detailing.


The above image shows the structure from beneath being braced before the brick had been applied.  I have since broken one joint in order to "straighten" one wall.  Just like real house construction, there's no such thing as a truly straight wall.  Everything must be shimmed and even then it doesn't quite make it true, plumb or square but in the end it looks pretty good.  More on shimming and imperfection in the next post where I discuss the fancy trim. <shudder>.

I'll close this post with an image I shared on Instagram recently.  I'm quite happy with how this little bar turned out.  The actual serving counter is complete as well but isn't shown here.  Still need to make bar stools and a display stand for the middle of the room but otherwise the detailing for the interior is coming along nicely.  Oh and of course it needs paint - that should go without saying but I'll mention it to be clear.  Probably a wood stain, but we'll see.




No comments:

Post a Comment