Search This Blog

Showing posts with label Detail Parts. Show all posts
Showing posts with label Detail Parts. Show all posts

Friday, February 6, 2026

Ensminger Veranda Part 1

No, the Shifter isn't finished, but while the gloss varnish cures I'm following my interest and starting work on the Ensminger Building, beginning with the elaborate veranda.  I'm using parts that aren't an exact match but follow the "rule of cool" and the spirit of kitbashing, using something I've already got in stock at the home hobby shop.  This is the Scale Structures Limited Gazebo kit, from which I'll be using the fancy posts and arched lattice detail, the ornate railing and the scribed floor plank sheet.

Let the filing begin!

The original kit instructions call for filing away a 30-35 degree angle from the rear of each upright post on the arched lattice sections in order to butt them together and create the illusion that two posts are in fact one.  I've got issues with this approach.  On the original model this would result in an unsightly gap behind the "post", where the two almost-halves meet.  In no gazebo ever have I seen two posts joined in this way as one conjoined post, but rather a single turned wood post is used with the railings attached to it.  This is what the drawings show but you'd have trouble making the kit parts align properly building it as instructed.

Getting closer...

However for my application of the parts, where the posts will be filed on a 45 degree bevel, the resulting post will indeed be just that - a single post comprised of two actual post halves.  I'll have a gap to deal with no matter how carefully and accurately I file them down but I can fix that with putty.  Where two arched lattice sections meet I'd need to either remove one post entirely or file away half of each post again, but this time producing a gap that's harder to hide.  For that reason I elected to remove one post and fill any gaps on that joint as needed.  The trick of course is to file slightly more from behind so the front is a tight fit, but there's that unsightly gap issue again. Sure, it is unlikely to be seen from a normal viewing angle but I'll know it's there!

Almost there (note, they're upside down)

The front veranda is deep - as deep as one arched lattice section - while the side veranda is shallower.  This works out well as the SS Ltd kit comes with 6 arched lattice sections.  I'll use 4 for the front veranda, 2 for the side veranda.  It also includes six sections of ornate railing which also must be shortened on each end to fit between the posts - note, this is what the original kit calls for!  I'll need all six and then some short bits which is fine since I've got a set of shorter railings, identical to the kit parts except half as long, which I'll use for the sides of the shallower veranda.

Section on the right de-flashed

I'd love to know what structure these parts were originally designed for, because the kluge required to turn these parts into a gazebo seems challenging.  However, it is often required of the kitbasher, indeed incumbent upon the modeler to see beyond the part as intended into the future purpose of the part as yet unknown.  In that respect I admire Jon Stetz, the designer of the SS Ltd Gazebo, for his creative use of such beautiful parts.  Perhaps my creative re-use of these parts might someday inspire another modeler to go and do likewise.

Wednesday, January 7, 2026

Golden Time

Upon returning from an inspiring visit to the California State Railroad Museum, I spent a lovely vacation day adding bits to The Shifter.  It took the whole day, in a way, because I'd add a bit then step away to let the glue cure before adding the next bit, waiting, adding another, and so on.  The process is enjoyable, especially when all the parts are at hand and ready to install.

There are still a few bits to add.  Careful observers may notice that at some point in the sequence one of the pop valves falls off the auxiliary turret - not to worry, I have it and will reattach it along with the whistle.  There's also one pipe to run from the engineer's side tank back to the cab, and I need to decide if I want to run piping for the air hoses beyond the pilot.  Otherwise, the detailing is done...well...except for adding the headlight but that's more about the wiring and getting a little in-line plug installed inside the boiler.  That's next.

cab seats

piping from turret to injectors

piping from turret to compressor

"water glass" piping

gauges, before moving, and brake stand

gauges after moving and quadrant

injector control rods


injector water feed line and overflow with diffuser

 

Wednesday, March 17, 2021

Office Detail...AGAIN!

The last structure I completed was the Seqouia Fallburgh Station, built as my Ocala Springs station for the Pine Branch of the Ocali Creek Railway.  I chose to go all in and really detail the structure's interior, including the entryway, waiting room and office.  So when I selected the next structure to build I wasn't expecting to once again be detailing an office, but here we are.  

The Suydam Union Ice kit comes with little wooden shapes which are supposed to represent chairs, desks, a sofa, file cabinets and a counter.  These would be suitable if the building were in the background.  However, it occupies a site on my railroad where it will be quite easy to look through the big windows into all that office space.  Good thing I bought those desk chairs!

I'm also testing out shades of blue for the structure, along with types of stucco material.  I've settled on the light blue shade but the darker is still not quite right.  I've also found that Durham's Water Putty mixed 1:1:1 with paint and water makes a terrific HO scale stucco.  I didn't invent this ratio - others have stumbled upon it and shared it just as I am doing here.  

I really don't need to be or want to be that guy remembered for detailing every interior of every building.  I'm content to focus on those that will be easily seen and maybe do a few that won't be seen as easily just because I want to.  I am inspired by a certain generation of Disney Imagineers who included many details in the attractions they designed even though the casual guest wouldn't see them. However, those viewers who looked more closely at a scene would be delighted to discover them.


Sunday, November 29, 2020

Saturday, November 28, 2020

Printed Parts & Pals

Recently I needed some chairs.  Well, really just one chair right away but more on that later.  After trolling the 'bay and coming up empty I turned to Shapeways.  There I found this seller who offered chairs and desks.  I already have desks.  I need chairs.  Thankfully, the seller was kind enough to bundle the chairs together without the desks.  


In order to offset the shipping cost I took a look at what else he had to offer and was delighted to find amphibians!  I model Florida and that means gators.  I lived there and sure enough, hang around the water long enough and you see them.  I've canoed and even swam with them.  Good times.  But more often you see turtles and occasionally frogs and toads.  

As of this post I've painted the gator and the chair, but not the frogs and turtles.  The gator will likely show up from time to time as a sight gag.  The chair has already found a home behind the station master's desk in the Ocala Springs depot.  More on that in an upcoming post.  The frogs and turtles will make it into the creek scene, someday, on the Pine Branch Park railroad.

 

If you want to purchase amphibians of your own, or any number of other neat parts, check out David Yale's Shapeways shop: https://www.shapeways.com/shops/dcyale?li=pb


Wednesday, September 2, 2020

Back on Station II

I say I'm back on station again because I had neglected this project again.  But now I'm re-engaged and hopefully this time I'll carry it across the finish line.  In addition to some roof work, I'm finalizing the interior details.  The only major custom work left is the ticket window bars...that's something I'm looking forward to seeing, but not necessarily doing.  It will be a challenge, to be sure.


This post however is about the stove.  Even in Florida a stove in the waiting room or even a fireplace was common.  Winters were cold and coffee was enjoyed year 'round so my Ocala Springs station had to have one.  I'd primed and painted the casting itself a while back but hadn't installed it for lack of a good stove pipe.  I was all set to bend one from heavy wire when I remembered I had saved a few sprues in my bits box.


The nice thing about sprues is they come with elbows and angles built-in, for replicating all sorts of piping.  This sprue segment in particular came from a Jordan kit, already black, so no need to paint.  I drilled into the casting as well as the sprue and CA'd a little bit of wire between as an alignment pin.  Then when that was dry I carefully glued the stove in place...though not carefully enough as I still managed to get glue on the chimney.  Hopefully the mistake won't be that visible through the windows.

Tuesday, July 28, 2020

Parts Plank

I use wooden sticks, often tongue depressors as seen here, with masking tape wrapped around them as detail parts painting handles.  These parts are all Milliput duplicates made in Oyumaru molds.  Milliput isn't expensive but I don't want it to go to waste especially if I've gone to the trouble to get my fingers all sticky mixing it.  So, I have a number of molds standing by to make parts with the excess.  Shown here: books, a clock (minus the face), storm drains, crates of lemons, a typewriter, a basket of oranges and a bunch of bananas.


The clock is the part I needed for the station waiting room and the reason I mixed this latest batch of Milliput.  But the grates will be useful as the street scene is installed, the fruit may find a home on the station platform and the books in the office.  There's already a typewriter on the agent's desk so this one will be stored and used elsewhere and the bananas?  Who knows.  They certainly will bring life to any scene with their bright yellow color.